Preliminary-Analysis-or-Systems-Planning-7-system-development-life-cycle

Should contain the work breakdown structure (WBS) for the 7 system development life cycle (SDLC) phases and activities under each phase, similar to some of the following:

    • Preliminary Analysis or Systems Planning
      • 1.1 Define mission, objectives, and purpose for system
      • 1.2 Develop detailed problem statement
      • 1.3 Describe current state
      • 1.4 Identify benefits for new system
      • 1.5 Identify scope, risks, and constraints
      • 1.6 Feasibility study
      • 1.7 Analyze formal system request
      • 1.8 Receive approval to go to next phase
    • System Analysis and Requirements Definition
      • 2.1 Requirements gathering
      • 2.2 Conduct interviews
      • 2.3 Surveys
      • 2.4 Document observations
      • 2.5 Sampling
      • 2.6 Review of artifacts
      • 2.7 Build business, data, process, and object models
      • 2.8 Conduct requirements reviews
      • 2.9 Generate system requirements specification document
    • System Design
      • 3.1 Develop physical model
      • 3.2 Design user interface
      • 3.3 Identify inputs, outputs, and processes
      • 3.4 Design internal and external controls
      • 3.5 Design features and functions
      • 3.6 Determine application architecture
      • 3.7 Conduct design reviews
      • 3.8 Develop final system design specification
    • Development
      • 4.1 Develop or code all components based on design
      • 4.2 Prototype components
      • 4.3 Conduct usability tests
      • 4.4 Design test for all other types of testing
      • 4.5 Unit test and fix errors
    • Integration and Testing
      • 5.1 Determine conversion activities
      • 5.2 Determine training activities
      • 5.3 Conduct testing activities
      • 5.4 Fix any errors that occur during the test
      • 5.5 Determine transition plan
      • 5.6 Develop a back-out and recovery plan
    • Acceptance, Installation, and Deployment
      • 6.1 Install any required software and hardware for production environment
      • 6.2 Validate that system is functioning correctly
      • 6.3 Conduct stress or volume tests
      • 6.4 Perform conversions and transitions
      • 6.5 Receive approval for going live
      • 6.6 Go live or perform back-out and recovery
      • 6.7 Close out any contracts and end project
      • 6.7 Conduct a post mortem or lessons learned
    • Operation Support and Maintenance
      • 7.1 Train all support personnel
      • 7.2 Establish all information technology (IT) security infrastructure
      • 7.3 Transition to operations and maintenance mode
      • 7.4 Ensure that the system is meeting service level agreement (SLA) goals

 
Do you need a similar assignment done for you from scratch? We have qualified writers to help you. We assure you an A+ quality paper that is free from plagiarism. Order now for an Amazing Discount!
Use Discount Code "Newclient" for a 15% Discount!

NB: We do not resell papers. Upon ordering, we do an original paper exclusively for you.